Replace Patient Lifts at South Bed Tower and SICU
Replace Patient Lifts at South Bed Tower and SICU
The project consists of providing design and construction services to replace patient lifts at south bed tower and SICU (VA Caribbean Healthcare System (VACHS)). As part of this project all existing ceiling lifts at the South Bed Tower (SBT) Building 30 will be removed and replaced and new patient lifts will be installed at Surgical Intensive Care Unit (SICU). These new lifts system will improve patient safety by means of a more modern patient lift system. Amount: $3,621,983.80