The firm San Diego Project Management, PSC is responsible as the Prime Contractor to conduct post- construction inspections on up to 80 PREPA transmission structures and evaluate via formal report (including Engineering certifications), if construction and materials conform to all specifications, design drawings, regulations, industry and PREPA Standards, to include all tower construction requirements, guying standards and applicable tension and clearance requirements. Contractor should provide weekly inspection reports to FEMA or its designee.